REPAIR AND RENOVATION OF OSIJEK HIGH SCHOOL PLAYGROUND
In Istarska ulica 1/D in Osijek (plot no. 5989/7, Osijek cadastral zone), a secondary-school sports complex was repaired and renovated: a new six-lane, 333 m athletics track (synthetic surfacing, Herculan SR National or equivalent), throwing/jumping event areas, refurbished football, basketball and volleyball courts, and a new bocce court.
Više...
In Istarska ulica 1/D in Osijek (plot no. 5989/7, Osijek cadastral zone), repair and renovation works were carried out on a secondary-school sports complex that included an athletics track, a long-jump runway and pit, five football pitches, a basketball court, two volleyball courts, a skate park, and an outdoor gym (the skate park and outdoor gym were kept in their existing state and were not part of this project). The existing athletics track and long-jump runway/pit were removed, and a new circular six-lane, 333 m track was built in their place, with an additional eight-lane 100 m straight incorporated into the circular track, finished with a synthetic permeable surface such as Herculan SR National or equivalent, 13-14 mm thick, applied in situ. Stormwater drainage is handled by infiltration into a new drainage system on the inner side of the track. Throwing and jumping event areas were built: a shot-put area, a long-jump/triple-jump runway (long-jump board only), a pole-vault runway, and a high-jump runway. The football pitch on the east side was rebuilt entirely from the subgrade up, with a minimum 25 cm base course, a 5 cm BNS 16 asphalt layer and a 3 cm AB 08 layer, finished with an acrylic asphalt coating such as DecoColor MP Classic 920-27 or equivalent, 1-2 mm thick. Three football pitches and one handball pitch within the track were repaired by cutting out and removing cracked and settled sections, patching with new asphalt, applying an emulsion spray coat over the whole surface, and adding a leveling asphalt layer (AB 08, approx. 3-4 cm), together with replacement of the edge drainage channel and gully gratings. The basketball court was refurbished by repairing a crack in the existing asphalt and edging it with a new polymer-concrete curb with a white rubber safety cap. The west volleyball court was extended to the required length while keeping its existing width, and the east court was removed down to all layers; both were edged with a polymer-concrete curb with a rubber safety cap. A new standard-size bocce court (28.5 × 4 m) was built on an asphalt base, covered with 0-4 mm graded eruptive stone, in accordance with Croatian Bocce Federation regulations.